|
|
|
Frames |
frames on sheets |
the work space |
|
|
|
is it that time already |
cutting out |
prefinishing |
|
|
|
centreboad sides |
the hog |
all bits ready |
|
|
|
ready to go |
trial fit |
centreboard in frames |
|
|
|
stem template |
double check frame positions |
another check |
|
|
|
1st planks attached |
plank two |
plank two |
|
|
|
view of staples and butt joint |
plank three |
three |
|
|
|
port side plank three prior to bonding |
port 3 again |
the view so far |
|
|
|
fairing in glass tape [composite micro fillers by Partington's Marine] |
fairing |
Undercoat, pre sanding |
|
|
|
Three sanding backs and recoatings later |
Three sanding backs and recoatings later |
Three sanding backs and recoatings later |
|
|
|
gunwhale lamination |
gunwhale lamination |
gunwhale lamination |
|
|
|
thin 1st coat of colour, gunwhales undercoated |
view transom |
1st coat of colour |
|
|
|
final finish |
final finish |
Off frames |
|
|
|
drips to remove |
ready to go back in workshop |
fillets pre-sanding and taping |
|
|
|
kingpost |
check of frame angles |
Quick test of tank top fit |
|
|
|
joints taped |
test fitting |
Frames being glued |
|
|
|
trial fit of remaining frames in position |
trial fit of remaining frames in position |
glueing frames |
|
|
|
aft tank going in |
aft tank glued |
aft tank |
|
|
|
aft space frame (bulkhead not attached) |
front tank glued |
kingplank |
|
|
|
from transom |
central tank formers [extra one] and aft space frame glued |
some fillets |
|
|
|
1st fit of central tank |
fillets done |
central tank sides glued |
|
|
|
some clamps |
test fit central tank top |
shroud mounts |
|
|
|
all tanks completed |
deck beams |
primed 1 |
|
|
|
primed 2 |
carlin supports |
shroud bearer fitting and last gunwhale laminate glued |
|
|
|
foredeck halves joined together |
test of adjustable jig for curved carlin |
did the jig work |
|
|
|
curved carlin and deck - trial fit |
all set ready for side decks |
starboard carlin |
|
|
|
deck carlin joint |
port carlin glued and clamped |
glue cuved carlin |
|
|
|
does deck still fit |
deck curved carlin joint |
deck beam top section |
|
|
|
future champion |
almost ready for foredeck |
cleaned up a bit |
|
|
|
a warm day so some painting |
and a visit from Mickey Mouse |
bumps and nibs removed and repainted |
|
|
|
foredeck deck finally on |
Just the rubbing strakes and front veneers to go. |
rubbing strake template |
|
|
|
starboard rubbing strake |
port rubbing strake |
veneers done |
|
|
|
cleat mount glued |
finished hull Jan 1st |
finished hull Jan 1st |
|
|
|
what she now looks like |
and another |
starting on the foils |
|
|
|
centreboard sheaved in carbon, faired and painted |
rudder blade sheaved in carbon, faired and painted |
too cold to varnish so hardware fix |
|
|
|
too cold to varnish so hardware fix |
15 degrees inside so 1st coat warmed varnish |
2nd coat |
|
|
|
long awaited mast stepping. |
raked |
almost finished |
|
|
|
just the final varnishing to do and boat name to go on. |
17th feb 2013 varnish done |
name on, sail ready, |
|
|
|
just need water. |
after a disaster with varnish getting yellow stripes when in the sun. Stripped and revanished. |
One Hadron dinghy waiting for launch day. Soon I hope. |